Pre-Designed. Reimagining the Home You Always Dreamed of.
If you're building your home outside of the same area, footprint, and height (beyond 110%), your project will follow typical permitting procedures. Pre-designed solutions skip the time and cost of design. Contact us for pre-designed options
Site Clearing:
We connect you with trusted partners for Phase 02 site clearing (After Phase 01 is signed off by EPA)
Estimated Schedule:
1 to 2 weeks
Estimated Cost:
30 to 100,000.00 depending on site size and configuration
Track 1: Permitting Only
This solution is for those that already have a designer and only need help with the permit process
What's Included:
Engineering (Civil, Structure, Soils, T-24 Energy)
Construction Permits
Estimated Schedule:
Approximately 2 weeks plus permitting review time (estimated at 9 months)
Estimated Pricing:
Track 1: $30.00/SF
Construction:
Schedule and cost vary based on design